2025
Overview
The part of an extension nobody sees once it is finished: the back of the house opened up, the steel frame installed and the new roof structure formed.
- Back of the house opened up under a scaffold roof
- Steel goalpost frame
- New joists and roof structure
- Temporary props during installation
Project journal
- 7 Feb 2025
Opened upThe rear of the house is opened up under a temporary scaffold roof. - 8 Feb 2025
Steel frameNew steel and timber joists go in over the stripped ground floor. - 11 Feb 2025
GoalpostA steel goalpost frame now spans the opened-up rear wall. - 25 Jun 2025
Carried by steelProps hold the back of the terrace while the new frame takes the load.