Rewire, plumbing, plaster, floors and decoration as one job.

We take whole houses and flats back to their structure and rebuild them room by room — wiring, plumbing, heating, stud walls, floors, kitchens, bathrooms and decoration — with one contractor and one programme.

  • Full rewires and new heating
  • Stud walls and layout changes
  • Plastering and screeding
  • Flooring and joinery
  • Painting and decorating
How long does a whole-house renovation take?
It depends on the size of the house and how far back the work goes. As a guide from our TrustATrader reviews, one whole-house renovation took about eight months, and the wiring, plumbing, kitchens, flooring and decorating for five apartments totalling 4,000 sq ft were completed in six months. The job runs as one programme, with one contractor coordinating every trade.
Which work needs certificates?
A rewire, new circuits and a new consumer unit are notifiable under Part P of the Building Regulations and come with an Electrical Installation Certificate. Gas work and boilers must be done by a Gas Safe registered engineer, and replacement windows need a certificate from a scheme such as FENSA or Building Control sign-off. Keep these papers: a buyer’s solicitor will ask for them.
How is the price worked out?
From an itemised quote after we have seen the house. Clients on TrustATrader mention clear, itemised pricing given in advance and kept to until completion, with changes priced up front when they add or remove something along the way.
Do you work with architects and interior designers?
Yes. One whole-house renovation came to us on an interior designer’s recommendation, and we build to the designer’s or architect’s drawings and finishes schedule. On one client’s two projects the architect handled most of the communication with our team, and both jobs stayed on schedule.